Lobby Waiting Area Lighting

Case Studies

Explore our recent projects and see how Elite Electrical delivers reliable, high-quality solutions across commercial and industrial sectors.

GET IN TOUCH

Case Studies

Explore our recent projects and see how Elite Electrical delivers reliable, high-quality solutions across commercial and industrial sectors.

GET IN TOUCH
  1. Aldgate House 3

    2026

    Aldgate House

  2. Image1

    2026

    Vitruvian

  3. J1011 01

    2026

    Premier League Studio’s

  4. J1010 05

    2026

    LMU

  5. J1007 01

    2026

    T.EN Genesis

  6. Linkedin J960 Linkedin 03

    2026

    LinkedIn

  7. Image001 Costar

    2026

    Costar

  8. J1015 02

    2025

    Smithsons Plaza

  9. J1006 03

    2025

    Elder Yard

Testimonials

Elite were fantastic and a pleasure to work with.
They were everything we would like for in a contractor – helpful, proactive, real team players.
They had a change of Contracts Manager during the course of the project, due to Andy Dimond leaving Elite, however, the way they handled it was spot on.
Bob Burkin was excellent and the site guys were great.
The only reason Elite have not been given a 10 on Health and Safety is due to us not “resting on our laurels” and always looking to improve on H&S standards.
Everything else is scored as maximum, which is fully deserved.

— King’s College London – West Wing Student Union 2015

Keith Mitchells attitude to the project was excellent. Although ‘small works’ he still organised his team diligently and did whatever was asked of him

— Salesforce – L35 – 2021

Elite Electrical are our preferred sub contractor because they know how we work and what we expect on all our projects.

Validation report was to a high standard and was well put together, Elite were on programme and even procured items early on so it would not affect the PC date.

Steve, Peter and team are friendly helpful and welling to work with us which is nice to see. One thing to note is going forward we would like more full time supervision on site even if you are working on smaller projects.

Thanks for your help on this project.

— Pearson – L6 80 The Strand – 2023

Elite performed very well on this project from pre-con all the way through to delivery and handover, the standard of workmanship was very high and positive comments on the quality were received from the client. The O&M and documentation was also good and complete, providing PD with very little comments. We would highly recommend Elite and look forward to working with them in the future. Well done to James Hughes and Keith Mitchell.

— Coldharbour Garage

A joy to work with, from day 1 the site supervisor Darren was quality-driven and had a great work attitude. This cascaded through the rest of the team who were helpful and always willing to go the extra mile in the name of a quality end product.

— City University Better Space

Very proactive with the containment installation phase of the project, which was challenging and dependent on attendances from the client’s teams who were not always as dedicated as Elite.

Always willing and able to react to client’s last-minute change of plans, especially during the Pro-watch panel change over phase.

A special mention to the Elite foreman; Tom Stamp, whose can-do attitude had a really positive impact on the successful completion of this project. He is a real asset to Elites business.

Keith Mitchell kept on top of the commercial side very well and it was good to see him on site out of hours to lead the Elite team.
If you would like further information regarding the project or guidance on the

— Elliott Advisors – Park Street 2018

Thank you for your work at Duke St. No snags for you from the client which speaks for itself.
Please pass my thanks on to George too he did a great job and nothing was too much trouble throughout the project, very good supervisor you have there.
Cheers and see you on the next one hopefully.

— Epiphany- 2023

Matt and the team completed the cable pulling works on time without too many issues. Were generally tidy, worked safely and helped with the overall handover of the project.

— CAE Phase 2b, Gatwick, 2023

The design was released on time and well-coordinated working with Excel for the coordinated Revit model. Considerations such as areas without containment perhaps should’ve been brought up earlier however this is only a small item.

There were a number of changes and challenges to work through on this project and these were well managed on-site by Paul Larkin with communication with TClarkes (Basebuild) being kept for installations and riser works.

The comms room was delivered early in the project but this was completed without any issues which assured the client and consulting team we could provide the quality & product they desired on time, this helped the throughout the remainder of the project.

Quality was held to a very high standard on this project and the delivery did not disappoint, any snags picked up internally were addressed accordingly in a fast time frame.

— Lewis Silkin – Arbor Building – 2022

Well executed installation by Bob Burkin who was well supported off site by KM

— MOPAC Gilmour Section House 2022

Elite Martin Heath was a really good PM on this project very proactive and went the extra mile for all of the Section 1 fit out GF reception and lift lobbies 1-9.
Very happy working with Elite Electrical and would like to work with Martin Heath .

— Invesco Real Estate, Phase B (Section 1), 107 Cheapside, 2021 (refer to 115116B)

Not much to do but sorted in good time.

— 22 Bishopsgate Ltd – 22 Bish – 2023

Loft Conversion Lighting

Have a project in mind? get in touch

Speak with our friendly team today about your project, or partnership opportunities

Get in touch