Lobby Waiting Area Lighting

Case Studies

Explore our recent projects and see how Elite Electrical delivers reliable, high-quality solutions across commercial and industrial sectors.

GET IN TOUCH

Case Studies

Explore our recent projects and see how Elite Electrical delivers reliable, high-quality solutions across commercial and industrial sectors.

GET IN TOUCH
  1. Aldgate House 3

    2026

    Aldgate House

  2. Image1

    2026

    Vitruvian

  3. J1011 01

    2026

    Premier League Studio’s

  4. J1010 05

    2026

    LMU

  5. J1007 01

    2026

    T.EN Genesis

  6. Linkedin J960 Linkedin 03

    2026

    LinkedIn

  7. Image001 Costar

    2026

    Costar

  8. J1015 02

    2025

    Smithsons Plaza

  9. J1006 03

    2025

    Elder Yard

Testimonials

Elite Electrical issued the validation report for this project to a high standard, which captured the electrical services current condition.
Steve and Peter managed the project well from start to finish. The site operatives had a good site attitude and know Overbury’s company standards. Elite Electrical had the correct access equipment for this project and made sure the H&S checks were completed onsite.
Elite Electrical ordered materials early so it would not affect the programme and they maintain programme throughout.
There were minor snags at the end of the project which were closed out ASAP.
Thanks for your help with this project.

— Pearson PLC, Split Demise, Level 2 Mezzanine, 2024

Great to work with the Elite team on this one.

Andy has everything under control and costs are always reasonable.

Andy & Ian acted on everything asked of them on-site and again delivered a project of good quality.

The only comment is snagging should be issued without being chased by Overbury.

— Dorling Kindersley – Embassy Gardens 2019

We consistently have a good experience with Elite Electrical.

Martin Heath did a fantastic job on this project and nothing was too much trouble.
Martin did some really long hours on-site to deliver this project, we feel this was because he had his hands full managing the works during the day and working on the tools in the afternoon/evening to keep things on track. This is not ideal for us as we needed to provide supervision for this.

— Glendower Capital, 8 St James’s Square, 2021

Good attitude.

— Jane Street Europe Limited – 20 Fenchurch Street 2017

Elite were very impressive from the first and until the last day on site. Your transitions between phases were seamless and you seemed to take all the additional works within your stride without any problems. To think of all the major refurbishment upgrades your team completed on programme and snag free is outstanding. Your can-do attitude and overall positive site moral was noticed by all and at times improved the other contractors around you.
I wish I could of scored you a perfect 10.0 but you just need to be more firm next time with PPE!
A special thanks to Keith, Butty, and the golden boy Ian for making this a fantastic project. Looking forward to the next one.

— MOPAC – Chadwell Heath Patrol Base Works – 2023

Excellent service as always. Elite took on a lot of extra client requests within the programme and put a lot of effort into getting the glass wall up lighters right.

— Sony Music Entertainment UK – Reception Refurb

A joy to work with, from day 1 the site supervisor Darren was quality-driven and had a great work attitude. This cascaded through the rest of the team who were helpful and always willing to go the extra mile in the name of a quality end product.

— City University Better Space

— Sir Richard Sutton, 30 Great Pulteney Street, 2023

Team standards were good, special mention Tom bennett

— MOPAC – Level 5 ESB – 2023

Never any issues with Elite, quite handy they were working just below on another one of our projects.

Paul Larkin is very helpful and gets the job done.

— Axa – l49 Demise Split 22 Bish – 2022

Andy and the team were very helpful within the design phase due to the moving target and misinformation from the house team

Very helpful with the licence to alter noted by Emma the project manager

— Akin Gump – Terrace Works – 2021

No issues. Always very helpful and delivered to high quality. Good to have a younger team in and still achieve the same results.

— Turner & Townsend, 1 New Change Square, 2023

Loft Conversion Lighting

Have a project in mind? get in touch

Speak with our friendly team today about your project, or partnership opportunities

Get in touch