Lobby Waiting Area Lighting

Case Studies

Explore our recent projects and see how Elite Electrical delivers reliable, high-quality solutions across commercial and industrial sectors.

GET IN TOUCH

Case Studies

Explore our recent projects and see how Elite Electrical delivers reliable, high-quality solutions across commercial and industrial sectors.

GET IN TOUCH
  1. J998 03

    2025

    L3 Smithsons Plaza

  2. J993 02

    2025

    Newgate Street

  3. J989 01

    2025

    CD&R

  4. J969 01

    2025

    Olivers Yard

  5. J946 09

    2025

    Bayham

  6. J928 01

    2025

    Jamestown Court (Rotunda)

  7. Project Wise J968 Project Wise 01

    2025

    Project Wise

  8. Arcelormittal Level 7 J965 Arcelormittal Level 7 01

    2025

    ArcelorMittal – Level 7

  9. Kingsway Gym J963 Kingsway Gym 01

    2025

    Kingsway Gym

Testimonials

Always a good company to work with Andy and Darren were on the ball
Contractors working for Elite were Hall and Kay Fire alarms, these were a struggle to get information from also SCS the client novated access control company had staff changes early in the project which led to some confusion and a delay in information

— William Blair – Broadgate Tower – 2021

Elite completed the design ahead of the programme and was very great to work with as usual.

— Legal & General – 101 St. Martin’s Lane 2016

Never any issues with Elite, quite handy they were working just below on another one of our projects.

Paul Larkin is very helpful and gets the job done.

— Axa – l49 Demise Split 22 Bish – 2022

The design was released on time and well-coordinated working with Excel for the coordinated Revit model. Considerations such as areas without containment perhaps should’ve been brought up earlier however this is only a small item.

There were a number of changes and challenges to work through on this project and these were well managed on-site by Paul Larkin with communication with TClarkes (Basebuild) being kept for installations and riser works.

The comms room was delivered early in the project but this was completed without any issues which assured the client and consulting team we could provide the quality & product they desired on time, this helped the throughout the remainder of the project.

Quality was held to a very high standard on this project and the delivery did not disappoint, any snags picked up internally were addressed accordingly in a fast time frame.

— Lewis Silkin – Arbor Building – 2022

Jim, Keith and the team helped deliver the project really well. There were a lot of challenges that had to be overcome including some that existed within the building, challenges from the landlord(s) and some that cropped up. All were handled well and solutions were promptly organised.
Jim was on top of health and safety and all items raised were rectified swiftly and the management of his site team was perfect.
The team went above and beyond in terms of rectifying existing kit/problems that we were left with on the floor.
If you would like further information regarding the project or guidance on the Project Plus system, please contact me on the telephone number listed below.

— Goodwin Procter – Bow Bells House – 2021

Elite were very impressive from the first and until the last day on site. Your transitions between phases were seamless and you seemed to take all the additional works within your stride without any problems. To think of all the major refurbishment upgrades your team completed on programme and snag free is outstanding. Your can-do attitude and overall positive site moral was noticed by all and at times improved the other contractors around you.
I wish I could of scored you a perfect 10.0 but you just need to be more firm next time with PPE!
A special thanks to Keith, Butty, and the golden boy Ian for making this a fantastic project. Looking forward to the next one.

— MOPAC – Chadwell Heath Patrol Base Works – 2023

Great service by Elite as always.

Andy was great at pre-contract getting us lead times, costs and drawings drafted for client approval.

Once on site, Martin Heath managed the project superbly and made my life very easy.

— Julius Baer, 8 Bleeding House Yard (Day 2 Works) 2023

Very good and credit to Steve P & Rob on site.
Problems came with solutions
Proactive in chasing up matters.

Took the initiative to generate a coordinated drawing and maintained ownership
Didn’t hide behind e mails – picked the phone up

— Peabody Trust – 45 Westminister Bridge Road 2021

Not much to do but sorted in good time.

— 22 Bishopsgate Ltd – 22 Bish – 2023

Elite are always on site, they are very helpful and have a very good relationship with the Client and Overbury. We never have any issues with their work.

— Francis Crick Summer 2023

Excellent project from Elite
Pre-contract they were really helpful and understood the scheme very quickly
On-site they were managed very well and delivered every time
The operatives site attitude was excellent
Quality was very good
Matt was a pleasure to work with
Keith was excellent with his cost reporting …..well done Keith! Definitely a Tier 1 contractor.

— CAE Enabling/Main works – Gatwick 2020

Worked with us on the programme and liaised well with the partitioning contractor during 1st fix.

— 30 Gresham Street 2018

Loft Conversion Lighting

Have a project in mind? get in touch

Speak with our friendly team today about your project, or partnership opportunities

Get in touch