Lobby Waiting Area Lighting

Case Studies

Explore our recent projects and see how Elite Electrical delivers reliable, high-quality solutions across commercial and industrial sectors.

GET IN TOUCH

Case Studies

Explore our recent projects and see how Elite Electrical delivers reliable, high-quality solutions across commercial and industrial sectors.

GET IN TOUCH
  1. Turner And Townsend J931 Turner And Townsend 01

    2024

    Turner and Townsend

  2. Golden House J929 Golden House 01

    2024

    Golden House

  3. J922 01

    2024

    British Land

  4. Crh No11 Strand J919 Crh Level 7 11 Strand 01

    2024

    CRH, No11 Strand

  5. Lloyds Project Together J911 Lloyds 01

    2024

    Lloyds Project Together

  6. Axa Level 11 22 Bishopsgate London J907 Axa Leve E4c99b03 01

    2024

    AXA, Level 11, 22 Bishopsgate, London

  7. Fidelis J906 Fidelis 01

    2024

    Fidelis

  8. Equinix J904 Equinix 01

    2024

    Equinix

  9. Smithsons Plaza J902 Smithsons Plaza 01

    2024

    Smithsons Plaza

Testimonials

Very well executed smaller project which enables larger project to begin.

— ArcelorMittal – BSH 6th floor PC Date: 27-Feb-2023 Team: Core

Second time that I have worked with Elite recently. At the start of the proiect Anthony Furlong asked where I thought improvements could be made. I mentioned that on the previous project health and safety standards dropped as the project progressed. There were no such issues on this project. Good to see that the conversation was taken on board. Easy team to work with!

— British Airways – Waterside House 2018re Perfect replacement

Matt Haste was excellent throughout the project.

— Cerberus UK Advisers LLP – 5 Savile Row, 2018

Elite Electrical done well on this job and to be honest they were consistent from start to finish. Keith Mitchell, Paul Larkin and team all know how Overbury work and the standards we require.

A few things this team done onsite to make us think this is:

1. Monitor labour levels from start to finish to make sure they are on the programme, if not bettering it.
2. Install to a high standard throughout the project to make sure they do not need to return to an item once completed.
3. If they do get pulled up on a snag which is rare they plan to close this out straight away, without us chasing them.
4. Take on board new ideas for example record there own good and bad H&S observations, then share this with us in there
weekly project report updates.

Thanks for your help getting this project over the line.

Very efficient on the BREEAM and environmental requirements of the project also, often submitting information before key dates and with no need to chase. Often actively opening the conversation to check that all information provided was correct and sufficient and reviewing any requirements which were outstanding.

— McDermott Will & Emery – 22 Bishopsgate 2021

Team standards were good, special mention Tom bennett

— MOPAC – Level 5 ESB – 2023

Well executed installation by Bob Burkin who was well supported off site by KM

— MOPAC Gilmour Section House 2022

Very proactive with the containment installation phase of the project, which was challenging and dependent on attendances from the client’s teams who were not always as dedicated as Elite.

Always willing and able to react to client’s last-minute change of plans, especially during the Pro-watch panel change over phase.

A special mention to the Elite foreman; Tom Stamp, whose can-do attitude had a really positive impact on the successful completion of this project. He is a real asset to Elites business.

Keith Mitchell kept on top of the commercial side very well and it was good to see him on site out of hours to lead the Elite team.
If you would like further information regarding the project or guidance on the

— Elliott Advisors – Park Street 2018

Site staff worked well in an occupied area.

— Kent Police – Folkestone Fire Damage – 2022

Kensington – as always very good from start to finish.

— RCA – Refurbishment Works – 2023

This was an excellent project as we have come to expect from Elite Electrical, perhaps better than usual because of Paul Larkin who was an absolute pleasure to work with and in control of all aspects at all times. Well done and thank you.

— Burges Salmon, 6 New Street Square, 2023

Great to work with the Elite team on this one.

Andy has everything under control and costs are always reasonable.

Andy & Ian acted on everything asked of them on-site and again delivered a project of good quality.

The only comment is snagging should be issued without being chased by Overbury.

— Dorling Kindersley – Embassy Gardens 2019

Sam Oates the site manager lead the project extremely well and was well supported by Peter Goode and Greg Barnes.

— Mastercard, 10 Upper Bank St, Canary Wharf 2015

Loft Conversion Lighting

Have a project in mind? get in touch

Speak with our friendly team today about your project, or partnership opportunities

Get in touch