
Case Studies
Explore our recent projects and see how Elite Electrical delivers reliable, high-quality solutions across commercial and industrial sectors.
Case Studies
Explore our recent projects and see how Elite Electrical delivers reliable, high-quality solutions across commercial and industrial sectors.
Testimonials
Sam Oates the site manager lead the project extremely well and was well supported by Peter Goode and Greg Barnes.
— Mastercard, 10 Upper Bank St, Canary Wharf 2015
Never any issues with Elite, quite handy they were working just below on another one of our projects.
Paul Larkin is very helpful and gets the job done.
— Axa – l49 Demise Split 22 Bish – 2022
We are pretty much done with the level 8 enabling electrical works, and I would like to congratulate Elite (Rob) on what a fantastic job he has done over the past few months, as everything has go as planned and more importantly with no down time what so ever to any science.
I am sure Rob has had a few sleepless nights with everything going on, but I would like to say how great full I am of how things have gone, as I truly believe without Rob this wouldn’t have happened. This also hasn’t gone unrecognised by the CRICK!
Now the weather is getting better and we have broken the back of level 8 we should meet up for a few beers and all pat each other on the back
Once again many thanks.
— Level 8 Enabling Works – 2023
Well executed installation by Bob Burkin who was well supported off-site by KM
— MOPAC Gilmour Section House – 2019
Excellent project from Elite
Pre-contract they were really helpful and understood the scheme very quickly
On-site they were managed very well and delivered every time
The operatives site attitude was excellent
Quality was very good
Matt was a pleasure to work with
Keith was excellent with his cost reporting …..well done Keith! Definitely a Tier 1 contractor.
— CAE Enabling/Main works – Gatwick 2020
Brilliant! Paul and Keith really did a superb job in all aspects of this project. Love working with these guys and making a complex project look easy.
— MOPAC Lot 2 & 3 – BCU 3, Stoke Newington Police Station 2018
Jim, Keith and the team helped deliver the project really well. There were a lot of challenges that had to be overcome including some that existed within the building, challenges from the landlord(s), and some that cropped up.
All were handled well and solutions were promptly organised.
Jim was on top of health and safety and all items raised were rectified swiftly and the management of his site team was perfect.
The team went above and beyond in terms of rectifying existing kit/problems that we were left with on the floor.
— Goodwin Procter – Bow Bells House – 2021
Very proactive with the containment installation phase of the project, which was challenging and dependent on attendances from the client’s teams who were not always as dedicated as Elite.
Always willing and able to react to client’s last-minute change of plans, especially during the Pro-watch panel change over phase.
A special mention to the Elite foreman; Tom Stamp, whose can-do attitude had a really positive impact on the successful completion of this project. He is a real asset to Elites business.
Keith Mitchell kept on top of the commercial side very well and it was good to see him on site out of hours to lead the Elite team.
If you would like further information regarding the project or guidance on the
— Elliott Advisors – Park Street 2018
Very proactive, James was always there and accommodating.
— Metropolitan Thames Valley Association – The Grange 2019
Another quality project produced and run by Elite Electrical.
I would like to thank Brad Worboys on behalf of the team, this was the biggest project he looked after since taking up the supervisor role and taking into account the way the clients team procured the lights and the way they were delivered he done a fantastic job trying to piece everything together.
When it came to the end of the project he was so committed working ridiculous hours to ensure all the works got completed and covering the business he works for who had various senior management away on holidays at different times..
Well done Brad !!!
— Jardine Lloyd Thompson – The Botolph Building, 2017
Jim, Keith and the team helped deliver the project really well. There were a lot of challenges that had to be overcome including some that existed within the building, challenges from the landlord(s) and some that cropped up. All were handled well and solutions were promptly organised.
Jim was on top of health and safety and all items raised were rectified swiftly and the management of his site team was perfect.
The team went above and beyond in terms of rectifying existing kit/problems that we were left with on the floor.
If you would like further information regarding the project or guidance on the Project Plus system, please contact me on the telephone number listed below.
— Goodwin Procter – Bow Bells House – 2021
Well executed installation by Bob Burkin who was well supported off site by KM
— MOPAC Gilmour Section House 2022

Have a project in mind? get in touch
Speak with our friendly team today about your project, or partnership opportunities









