Astrea
Completion of 6 floors Cat A+, mains upgrade, new LV switch panel & power distribution, end of trip facilities, reception and roof terrace.
Main Contractor
Collins
Duration
65 Weeks
M&E Consultant
GDM
Project Value
£1Million – £2.5Million
Services Provided
Design & Build
Astrea
Completion of 6 floors Cat A+, mains upgrade, new LV switch panel & power distribution, end of trip facilities, reception and roof terrace.
Main Contractor
Collins
Duration
65 Weeks
M&E Consultant
GDM
Project Value
£1Million – £2.5Million
Services Provided
Design & Build
Project Information
Completion of 6 floors Cat A+, mains upgrade, new LV switch panel & power distribution, end of trip facilities, reception and roof terrace. Works consist of new incoming mains, LV switch panel, panel board, distribution boards, UPS, lighting, power, fire alarm, security & lightning protection.
The scheme included installation of open plan suspended lighting and recessed down lighting to corridors along with new feature pendants. Lighting control consists of new Intelligent sighting control system linked back to a head end PC.
Small power consists of cleaners socket outlets and mechanical power supplies such as solenoids, water heaters, sensor flushes & BMS panels.
A new fire alarm installation has been carried out and commissioned as part of an L1 system. New fire alarm panel has been installed in the reception area.
New LV panel and sub mains infrastructure supplying landlords and tenant areas has been installed through the entire building with UPS back up on life safety such as fire fighters lift and AOV.